A panel with no free spaces and a main that trips is telling you the house has outgrown it. We calculate the load, upgrade the panel or the whole service where needed, and lay out the new panel so it has room to grow.
- Calls answered 24/7
- Load calculated first
- Room left for new circuits

- Load calculation on existing and planned loads
- Panel or service upgrade chosen
- Circuits moved, labeled and inspected
Panels and breakers we install include Square D, Siemens and Eaton, with Leviton surge protection where it fits.
An electrical panel upgrade in New York usually raises capacity from 100 to 200 amps so the house can carry new loads like an EV charger, heat pump or induction range; national 2026 cost guides put a 100 to 200 amp upgrade at about $1,500 to $4,000. A load calculation comes first, because some homes can add loads with load management instead.
Rather ask a person?(929) 755-0293What a panel upgrade involves
Most panel upgrades start with a plan to add something: a charger, a heat pump, a kitchen with induction. The load calculation totals what the house already uses and what it will add, and shows whether the existing service can carry it. Sometimes it can, with load management. Often it cannot, and the panel and service need to grow.
A true upgrade usually includes the meter base and service conductors, which means the utility disconnects and reconnects power. We move every circuit to the new panel, fix any double taps or mismatched breakers we find, and label the directory so it matches the house. When only the service is the limit, see service upgrades; when the panel is failing at the same size, see panel replacement.

Updated September 2026
What moves the cost of a panel upgrade
The utility connection and the existing wiring decide most of it.
- Service change or panel onlyReplacing the meter base and service conductors adds a lot.
- Utility requirementsMeter location and scheduling come from the utility.
- Circuit conditionOld or damaged circuits found during the move need fixing.
- Panel locationRelocating the panel adds wiring and patching.
- Load management insteadSometimes the cheaper route avoids the upgrade entirely.
Upgrade the panel or manage the load
| Factor | 200 amp upgrade | Load management |
|---|---|---|
| What changes | Panel, often meter and service | A controller, smart charger or smart panel |
| Utility involvement | Yes | Usually none |
| Room for future loads | Plenty | Limited |
| Best for | Several new loads, old panels | One new load, a panel in good condition |
Old, full or damaged panels favor the upgrade; a sound panel only slightly short suits load management.
Three reasons to upgrade a panel
100 Amp to 200 Amp Upgrade

The standard upgrade. A 100 amp panel was fine for a house with gas heat and a gas range; with central air, a dryer and a couple of space heaters it runs close to the limit. Moving to 200 amps means a new panel, usually a new meter base and service conductors, and the utility's disconnect and reconnect. We size the new panel with spare spaces so the next circuit does not need another upgrade, and we correct any double taps found along the way.
Planning range (national sources, 2026): $1,500 to $4,000. Coastal-market pricing and building access change the figure; this is a planning band, never a quote.
Adding Capacity for an EV or Heat Pump
A Level 2 charger draws continuously for hours, and a heat pump with electric backup can draw heavily on the coldest night. Either can push a small service over the edge. We run the numbers for the specific equipment, including the charger's amperage setting and the heat pump's backup strips, and then choose between an upgrade and managing the load. The decision is made before the equipment is ordered, not after it arrives, and you get the calculation in writing.
Smart Panel and Load Management Upgrade

Load management lets large loads share capacity: the charger slows or pauses when the dryer and range are running, then resumes. It can be a smart charger, a load-shedding module or a smart panel that controls circuits individually. For homes that are close to the limit rather than well over it, this can avoid a full service upgrade. We explain which approach fits, and where the limits of each are, including what happens when several big loads want power at the same moment.
Planning range (national sources, 2026): $800 to $1,500 for the charger plus $300 to $600 for the circuit. Coastal-market pricing and building access change the figure; this is a planning band, never a quote.
Capacity pressure in New York homes
A single Level 2 charger can draw 24 to 48 amps continuously, which on a 100 amp service leaves little room once heating, a range and a water heater are running. In New York City, labor also costs more than national figures suggest: coastal markets run 20 to 40 percent above them, so a published upgrade range is a floor here rather than a middle. We quote from the load calculation and the actual site, not from national averages.
How a panel upgrade runs
Load calculation
Existing and planned loads totaled.
Filings
Permit filed; utility request made where the service changes.
Prepare
New panel, meter base and conductors staged.
Cutover
Power off, circuits moved, panel and service replaced.
Inspect and label
Inspection, reconnect and a clear directory.

Planning an EV, heat pump or new kitchen?
Check the panel first. Call to set it up.
Signs the panel has run out of room
- No free spaces
Tandem breakers everywhere and nowhere to add a circuit.
- Main breaker trips
The whole house is hitting the service limit.
- Lights dim when the AC or dryer starts
Heavy loads pulling voltage down.
- Double-tapped breakers
Two wires under one screw to make room.
- Rust or scorch marks inside
Moisture or heat damage. Have it inspected.
- A new charger or heat pump planned
The load may exceed what the panel can carry.
Panel upgrade questions
A load calculation on your existing and planned loads answers it.
Sometimes, with a load-managing charger or panel.
For the cutover window, scheduled with the utility.
Yes, and service changes also involve the utility.
Yes, double taps and mismatched breakers are corrected.
Often, if the new location meets clearance rules.
For homes near the limit, it can be.
Related work in the same system
Dedicated Circuit Installation
DetailsWhole-House Surge Protection
DetailsReplacing a failing panel
DetailsElectrical Service Upgrade
DetailsGuides: Panel upgrade costs in New York and EV charging in an apartment building
Size the panel for what comes next
Call any hour. We start with the load calculation and recommend only what the numbers support.